Setup Biditems-Customized Tab
Be sure to check out the options in the Customized Tab for setting up biditems. Some of the options are new and undocumented in 2015. There is a taxable biditem option now where the entire biditem can be taxed. Go to Setup Biditems>Customized View. As…
Recommended Optional Settings – Quote Folders
There are two optional settings that every estimator should activate. The first one shows the quantity for each material or sub in the grid (and not just on the bottom of the screen). This does not take a lot of screen room and most users…
Export to Primavera P6 from HeavyBid – SDK
In order to export an estimate to P6 you will be required to the Software Development Kit (SDK) installed. Attached are selected pages from the Primavera administrator manual that addresses this. Also P6 will have to be installed in the same environment as HeavyBid. For…
Listing of Local Materials/Subs not in System Wide Materials Codebook
Are you inputting the same materials on the fly for every estimate? To increase your efficiency do the following. When your estimate has been completed get a list of the created materials/subs and move them into the system wide codebook. Two ways to do this….
Using HeavyBid to Calculate Project’s Cost to Complete
HeavyBid is a good tool for calculating a project’s cost to complete and it gives you a snapshot of each succeeding month’s remaining work. Start with the conformed estimate and at the end of each month for each bid item (or you can do it at the…
Clean up Spreadsheet Calculations
If you are a regular reader of my blogs you know I like the internal spreadsheet (SpreadSheet Gear) in HeavyBid. But honestly there are a lot of spreadsheets in the list that you will never use such as all the Metric ones (unless you are…
Copy from Other Estimates – Version 2015
The new Copy function in HeavyBid Version 2015 is a big improvement over the the previous routine. In 2014 and previous versions if you copied from another estimate with different labor and equipment codes it would bring those resources over with their costs. The issue is…
Trapping Errors – Detect Changes to Activities
In Version 2015 the activity “Unreviewed” box preference is estimate specific (See my previous blog detailing this revision LINK). This is a very significant change since previously it could be changed only for all estimates (system preference). So this is how it can work for…
Tool Preferences V2015-Unreviewed Activity Check Box
Tools>Preferences is an area that many HeavyBid users don’t customize or at least review regularly. If your company has updated Version 2015 now is the time to review all the preferences and at the same time customize options to take advantage of HeavyBid extensive feature…
Indirect Bid Item(s) Versus Indirects in Mobilization-Best Practice Discussion
I train companies new to HeavyBid who historically have put their indirect costs all in mobilization. Estimators who do this come from a background of estimating with a spreadsheet or just by hand where it was difficult to spread indirect costs. Usually companies that continue…